So I just want to make a quick post, to show the world I am still alive. There are going to be 115 of these liquid-cooled APC units, and the room is starting to look like a scary scene from 2001, with alot of the black obelisks looming scarily in this space.
Those black obelisks come in giant crates like what you see in this photo here.
It takes quite a lot of work to get them shipped, unpacked, moved into place, wired to the power, then plugged into the chilled water lines. Overall, it's about a 3 day process. I can't believe just how much work has gone into this so far - I mean, the manpower required for just the cooling in the room is nuts.